UMM Institutional Repository

MANAJEMEN WAKTU, BIAYA DAN SDM PADA PROYEK AUDITORIUM UNIVERSITAS KATOLIK WIDYA MANDALA SURABAYA DENGAN MENGGUNAKAN METODE PERT DAN PDM

Wibisono, Gunawan (2019) MANAJEMEN WAKTU, BIAYA DAN SDM PADA PROYEK AUDITORIUM UNIVERSITAS KATOLIK WIDYA MANDALA SURABAYA DENGAN MENGGUNAKAN METODE PERT DAN PDM. Undergraduate (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (911kB) | Preview
[img]
Preview
Text
BAB I.pdf.pdf

Download (160kB) | Preview
[img]
Preview
Text
BAB II.pdf.pdf

Download (484kB) | Preview
[img]
Preview
Text
BAB III.pdf.pdf

Download (232kB) | Preview
[img] Text
BAB IV.pdf.pdf
Restricted to Registered users only

Download (622kB) | Request a copy
[img] Text
BAB V.pdf.pdf
Restricted to Registered users only

Download (153kB) | Request a copy
[img] Text
LAMPIRAN.pdf.pdf
Restricted to Registered users only

Download (5MB) | Request a copy

Abstract

A project usually has a deadline for completion which means all work must be completed according to the planned schedule. The project owner or leader often wants an analysis to find out the possibility / certainty of achieving the target schedule. Project evaluation and review techniques (PERT) are methods that are made to deal with situations with a degree of uncertainty in the aspect of the period of activity. One of the projects to be reviewed is the Auditorium of the Widya Mandala Catholic University of Surabaya located on Jalan Kalisari No. 1, Kalisari, Mulyosari, Kota Surabaya. This building is located in the area of Pakuwon City Housing with a building area of 7704.16 m2 and has specifications of 4 floors and 3 mezzanines. From the results of the calculation of the network obtained the expected time of the method used is 36 weeks with the largest probability of completion of the project around 99%. The human resource needs for each work obtained the number of workers for 131 people. And from the results of the recapitulation of the cost budget plan, the total budget for material and labor costs is Rp. 8.060,013,995.

Item Type: Thesis (Undergraduate (S1))
Student ID: 201210340311174
Thesis Advisors: Yunan Rusdianto (0728065901), Rofikatul Karimah (0703076701)
Keywords: PERT ; Network ; Resource ; Costs
Subjects: Q Science > Q Science (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201210340311174
Date Deposited: 26 Aug 2019 03:20
Last Modified: 10 Sep 2019 01:16
URI : http://eprints.umm.ac.id/id/eprint/52497

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo