STUDI ALOKASI SUMBER DAYA MANUSIA, BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN LABORATORIUM FAKULTAS PETERNAKAN-PERIKANAN UNIVERSITAS MUHAMMADIYAH MALANG

Legowo, Putut (2008) STUDI ALOKASI SUMBER DAYA MANUSIA, BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN LABORATORIUM FAKULTAS PETERNAKAN-PERIKANAN UNIVERSITAS MUHAMMADIYAH MALANG. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
STUDI_ALOKASI_SUMBER_DAYA_MANUSIA.pdf

Download (52kB) | Preview

Abstract

In arranging the project there are hind of activities that have big quantity, so that it needs agood management in order to the implementation will on time. So there is no fluctution of human resources Project managemen has an impotant role to reach the goal eggiciently and effectively. Giving dirrection the human resources and other resaurces in order to run to the right and certain direction. Besides, to make the schedule it Use PERT ( Program Evaluation and technique) method and to make it easier the controling of using computer program intrument Microsoft Project 2003 The result of the calculation found that the cost for project of developing Laboratorium building of faculty of University of Muhammadiyah Malang is about Rp 1.347.698.786,44 (including PPN 10%), human resources that was use about 4.859,56 man-day, therefore, from the result of arranging the project with considering the Holiday and other special days so the project can be finished for about 166 days with the fastest time 157,171 days and the slowest time 174,829 days.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Anggit Aldila
Date Deposited: 15 May 2012 02:50
Last Modified: 15 May 2012 02:50
URI: http://eprints.umm.ac.id/id/eprint/5247