UMM Institutional Repository

ANALISIS PERTUKARAN WAKTU DAN BIAYA (TIME COST TRADE OFF)UNTUK MENGEJAR KETERLAMBATAN PELAKSANAAN PROYEK PEKERJAAN GEBRANG TOL PROBOLINGGO TIMUR

Arganata, Riedha Asharry (2019) ANALISIS PERTUKARAN WAKTU DAN BIAYA (TIME COST TRADE OFF)UNTUK MENGEJAR KETERLAMBATAN PELAKSANAAN PROYEK PEKERJAAN GEBRANG TOL PROBOLINGGO TIMUR. Undergraduate (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (605kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (126kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (625kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (369kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (819kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (85kB) | Request a copy
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (50MB) | Request a copy

Abstract

Each development project activity in the initial planning stage has been determined how the process, steps, materials, human resources, tools used, costs, and the duration of the development plan. In the implementation, not all activities run according to plan, there are technical or non-technical problems and external disruptions that cause the project to not run according to duration. Then it is need a method to solve problems to make activities run according by plan or reduce the problems that ensue. Then in this research the Time Cost Trade Off method is used to determine the optimal time duration when the activity carried out goes backwards from the planned activity duration. The Probolinggo East Toll Gate construction project which is run into delays is then analyzed using the Time Cost Trade Off method. The result is an ideal time to complete all work within 141 days with a 21 day delay from the time of completion which has been given by Work Orer (SPK) for 120 days.

Item Type: Thesis (Undergraduate (S1))
Student ID: 201210340311145
Thesis Advisors: Yunan Rusdianto (0728065901), Erwin Rommel (022036701)
Keywords: Duration; Velocity; Time; Time Cost Trade Off
Subjects: L Education > L Education (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201210340311145
Date Deposited: 24 Aug 2019 02:59
Last Modified: 07 Sep 2019 02:50
URI : http://eprints.umm.ac.id/id/eprint/51731

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo