UMM Institutional Repository

STUDI EVALUASI TINGKAT PELAYANAN PEJALAN KAKI PADA KORIDOR JALAN TLOGOMAS KM. 7.600 – 8.000KOTA MALANG

KURNIAWAN, GIGIK (2008) STUDI EVALUASI TINGKAT PELAYANAN PEJALAN KAKI PADA KORIDOR JALAN TLOGOMAS KM. 7.600 – 8.000KOTA MALANG. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
STUDI_EVALUASI_TINGKAT_PELAYANAN_PEJALAN_KAKIPADA_KORIDOR_JALAN_TLOGOMAS_KM.pdf

Download (91kB) | Preview

Abstract

Road street of Tlogomas Km. 7.600 - 8.000 Malang Town represent one of [the] connective main road centre of activities [of] Malang Town with Town Stone. [About/Around] him there are is assorted [of] medium service of public, supported [by] the existence of campus 3 UMM, as a result the area have remarkable fascination so that emerge various problem of social which continue to grow and expand in all roadside and also jam of effect of[is amount of pedestrian which progressively mount. [Is] so that needed [by] evaluation concerning function of crossing place and pavement or zebra of cross. How requirement of karkteristik, volume and density of pedestrian expected can know storey;level service of approach and pavement which can finish conflict [among/between] vehicle traffic and pedestrian. Pedestrian [is] someone [doing/conducting] its journey with activity walk except them and baby which physically cannot its its[his]. Storey level service of it self cover, speed walk ( Speed Pedestrian), set of is wide [of] current ( unit of width flow), group or entourage ( platoon), road;street kepadatn ( pedestrian of density) and place or room walk ( pedestrian of space). Become to know storey level service of pedestrian needed [by] pavement dimension data, pedestrian volume, speed of pedestrian, traffic current volume and time go through him. Result of pedestrian performance evaluation [at] storey level service of pedestrian [at] Side 1 where V15 = 326 ped / 15 minute, U = 76.73 m / minute, Vpi = 19 ped/menit/meter of including storey level service of B and Side 2 where V15 = 77 ped / 15 minute, U = 81.09 m / minute, Vpi = 5 ped/menit/meter of including service storey level A. While in analysis 5 year to come storey level service of pedestrian pursuant to each of that is : Side 1 in the year 2008 - 2012 storey level service of C and side 2 in the year 2008 - 2009 storey level service of A, while in the year 2010 - 2012 service storey level B. Proposal defector facility walke [at] study location counted 2 crossing place, as for appropriate type [is] Zebra of Cross with proposal in the year 2007

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Anggit Aldila
Date Deposited: 11 May 2012 02:36
Last Modified: 11 May 2012 02:36
URI : http://eprints.umm.ac.id/id/eprint/5031

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : repository@umm.ac.id - Website : https://lib.umm.ac.id - Online Catalog : https://laser.umm.ac.id - e-Theses : https://etd.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo