UMM Institutional Repository

MANAJEMEN WAKTU SERTA BIAYA DAN SDM PROYEK KONTRUKSI PADA PEMBANGUNAN PONDOK PASANTREN AL-KHAIRAAT SINIU DENGAN MEGGUNAKAN METODE PERT (Studi kasus proyek Pembangunan Pondok Pesantren Al-Khairaat Siniu)

Atika, Nur (2019) MANAJEMEN WAKTU SERTA BIAYA DAN SDM PROYEK KONTRUKSI PADA PEMBANGUNAN PONDOK PASANTREN AL-KHAIRAAT SINIU DENGAN MEGGUNAKAN METODE PERT (Studi kasus proyek Pembangunan Pondok Pesantren Al-Khairaat Siniu). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (596kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (314kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (742kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (315kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (111kB)

Abstract

Project managers always want to find methods that can improve quality and control to deal with the number of activities that tend to increase. To improve the quality of planning and control in the Siniu Pondok Pasantren Al-Khairaat development project, a Project Evaluation and preview Technique (PERT) method was used with a comparison of the Preedence Diagram Method (PDM) method. Planning for optimal project completion time using PERT and PDM methods for 245 days with a total cost of Rp. 8,809,000,000.00 (including contractor profits + 10% VAT). From the results of the calculation of the project completion time target analysis T (d), it shows that the probability of the project being completed within 245 days (normal time) is only 50%. Whereas if the project completion time period is added by 3S (three times the standard deviation), which is 245 + 6.12 days = 252 days, then it is likely that the project will be completed in kerun time 252 days by 87% (safe / not late).

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201310340311008
Keywords: Time, Cost, HR, PERT Method
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 26 Jul 2019 03:42
Last Modified: 26 Jul 2019 03:42
URI : http://eprints.umm.ac.id/id/eprint/47410

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo