ANALISIS BIAYA DAN WAKTU METODE BOTTOM UP PADA PEKERJAAN STRUKTUR BAWAH (BASEMENT) DENGAN MENGGUNAKAN DEWATERING MAYAPADA HOSPITAL SURABAYA

Farista, Muhammad Mukti (2019) ANALISIS BIAYA DAN WAKTU METODE BOTTOM UP PADA PEKERJAAN STRUKTUR BAWAH (BASEMENT) DENGAN MENGGUNAKAN DEWATERING MAYAPADA HOSPITAL SURABAYA. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (296kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (963kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (577kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (3MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (359kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (469kB)

Abstract

Bottom-up method is applied in a construction of a building that starts from the foundation work of the basement to the uppermost floor based on the plan. Moreover, another method used to construct the bottom structure of a basement is the top-down method. It starts from the ground floor coinciding with the construction of the basement. Meanwhile, dewatering is a work of civic engineering aimed to control the groundwater during construction, especially the construction of a basement. This analysis aimed to figure out the difference between cost and time on the project of bottom structure (basement) construction with bottom-type method and dewatering with top-down method. The initial step in analysing the cost and time was collecting the data image of the planning of top-down method and dewatering construction applied by the owner. The analysis used in the bottom-up method and dewatering were implementation method analysis, work unit analysis, cost analysis, and implementation time analysis. The top-down analysis showed the results of 20 weeks and cost of IDR 45.822.915.714,5. The bottom-up analysis showed the results of 47 weeks and cost of IDR 44.551.852.134,6. The dewatering construction on top-down method obtained the result of 12 months and cost of IDR 1.724.800.550,20. Meanwhile, the dewatering construction on top-down method obtained the result of 12 months and cost of IDR 1.398.965.725,30.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201410340311161
Keywords: Bottom Up, Top Down, Dewatering, Cost, Time
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 03 Jul 2019 01:40
Last Modified: 03 Jul 2019 01:40
URI : http://eprints.umm.ac.id/id/eprint/46726

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo