UMM Institutional Repository

PERENCANAAN ANGGARAN BIAYA WAKTU DAN SDM MENGGUNAKAN METODE PERT PADA PROYEK APARTEMEN DINO JATIM PARK 3 KOTA BATU

Kirom, Musyafa’ Abdul (2019) PERENCANAAN ANGGARAN BIAYA WAKTU DAN SDM MENGGUNAKAN METODE PERT PADA PROYEK APARTEMEN DINO JATIM PARK 3 KOTA BATU. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (561kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (791kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (4MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (648kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (3MB)

Abstract

All projects basically have a deadline in which it must be completed on time. The project owner or loan often want to do an analysis to find out the possibility/certaninly of accomplishing the target. Project Evaluation Review Technique (PERT) is a method made for dealing with the uncertainly of the periode of activity. This method uses three estimation number froam each activity, namely optimistic time, most likely time, and pessimistic time which wile calculate how much the probability number of the opportunity of the project to be accomplished by the target. One of the project to be reviewed is Dino Apartment located in Beji Village, Junrejo District, Batu City. It was located in a touristy place of Jatim Park 3 area and has a total 14 floors starting from the ground floor. The result of working network calculation showed the expected time of the method use was 365 days with the largest probability number of the project completion was abaout 50%. The need of human resource where obtained for 40 iron workers and 84 formwork worker. The result of rhe recapitulation of budget plan performed a total budget for material and wages of labor by Rp. 44.702.625.038

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201210340311128
Keywords: Budget, Human Resource, Pert
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 23 May 2019 07:43
Last Modified: 23 May 2019 07:43
URI : http://eprints.umm.ac.id/id/eprint/46294

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo