UMM Institutional Repository

EVALUASI METODE KERJA PEKERJAAN PENULANGAN KOLOM, BALOK DAN PLAT LANTAI DENGAN METODE TIME AND MOTION STUDY (Studi kasus : Proyek Pembangunan Gedung Parkir dan Perkantoran FISIP Tahap II Universitas Brawijaya Malang)

Cahyani, Irdianti Dwi (2018) EVALUASI METODE KERJA PEKERJAAN PENULANGAN KOLOM, BALOK DAN PLAT LANTAI DENGAN METODE TIME AND MOTION STUDY (Studi kasus : Proyek Pembangunan Gedung Parkir dan Perkantoran FISIP Tahap II Universitas Brawijaya Malang). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (357kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (843kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (892kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (77kB)

Abstract

Productivity is an essential factor in determining the success of construction work. The key factor of the implementation of construction work is an individual ability. The faster a person completes the job, the higher of productivity he has. One of the main factors in affecting productivity is work method. The methods used in this research are Time and Motion Study. The variables consist of age, salary, work group composition, and education level. The average score of those variables is called by multiple determination coefficients. Each variable has certain value, such as column reinforcement job is 80.2 percent, Beam reinforcement job is 82.7 percent, and floor plate reinforcement job is 83.6 percent. However, each variable has dominant role towards productivity, to name work group composition (towards column reinforcement) is about 0.791; salary with beta value (towards beam reinforcement) is about 0.668; and salary with beta value (towards floor plate reinforcement) is about 0.672.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201110340311030
Keywords: Dominant, Productivity, Simultaneously, Work Method
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 02 Apr 2019 02:16
Last Modified: 02 Apr 2019 02:16
URI : http://eprints.umm.ac.id/id/eprint/45682

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo