UMM Institutional Repository

PERENCANAAN PONDASI RAKIT – TIANG SEBAGAI ALTERNATIF PONDASI PADA GEDUNG PRIME PARK HOTEL & CONVENTION MATARAM – LOMBOK

Wibisono, Andrian (2019) PERENCANAAN PONDASI RAKIT – TIANG SEBAGAI ALTERNATIF PONDASI PADA GEDUNG PRIME PARK HOTEL & CONVENTION MATARAM – LOMBOK. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (647kB) | Preview
[img]
Preview
Text
BAB 1.pdf

Download (44kB) | Preview
[img]
Preview
Text
BAB 2.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB 3.pdf

Download (579kB) | Preview
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (59kB) | Request a copy
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Prime Park Hotel & Convention Mataram is one of tourist attractions located at Jalan Udayana No. 16 Mataram, West Nusa Tenggara. This site is functioned as the accommodation facility for tourists. The site is built on the area of 6,093 m2 and the total height reaches 44.6 m. The load calculation for the building was by ETABS program referring to SNI 1727-2013 on the minimum loading for building structure, and SNI 1726-2012 on the earthquake resistance management for building and non-building structure. The analysis and calculation on loading resulted in the total building load reacted 513975.58 N. The building foundation is planned to use raft-pile foundation. The shape of raft foundation is following the basement floor with the area of 3628.25 m2 and width of 1.50 m. The raft foundation construction was planned to use a 35 Mpa concrete, and concrete reinforcement for longitudinal and transverse directions at the top and bottom was planned to use D25-100. The pile that uses are produced by PT. Adhi Persada Beton with the diameter of 0.60 m, penetration depth of 9.0 m, and the number of piles of 123 pieces. The total bearing capacity of foundation was 866737.85 kN, consisting of bearing capacity of raft foundation = 818968.59 kN and bearing capacity of groups pile = 47769.26 kN. The total settlement of foundation was 28 cm ≤ maximum permit settlement 28.67 m.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201410340311128
Keywords: Stability, Foundation Bearing Capacity, Settlement, Raft-pile Foundation
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 02 Apr 2019 01:43
Last Modified: 02 Apr 2019 01:43
URI : http://eprints.umm.ac.id/id/eprint/45676

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo