PERBANDINGAN PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DENGAN METODE KONVENSIONAL DAN HALF SLAB DITINJAU DARI WAKTU DAN BIAYA (Study Kasus: Rumah Sakit Lavalet Malang)

Munir, Sirajul (2018) PERBANDINGAN PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DENGAN METODE KONVENSIONAL DAN HALF SLAB DITINJAU DARI WAKTU DAN BIAYA (Study Kasus: Rumah Sakit Lavalet Malang). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (424kB) | Preview
[img]
Preview
Text
BAB 1.pdf

Download (216kB) | Preview
[img]
Preview
Text
BAB 2.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB 3.pdf

Download (331kB) | Preview
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (3MB)
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (97kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (7MB)

Abstract

The appointing of a method is common in a certain project implementation whenever there is a situation in the field to address. The circumstance requires the project executor must develop a new method apart from the conventional ones. As in platform structure, there is a non-conventional method that applies namely half slab. From the analysis result in Lavalete Hospital of Malang City, there is a comparison between the two methods, namely the conventional and half slab methods. The platform with the conventional method cost a total of Rp. 2,549,075,062 while the half slab method cost a total of Rp. 2,694,729,852. From the cost analysis result, the conclusion shows that the conventional method is cheaper than the half slab with the difference of Rp. 145,654,789.78 which equals to 5.41%. The analysis on the time consumption shows that the conventional method required 104 days while the half slab method required 71 days. The result of the study shows that the half slab method is faster than the conventional one in term of time span with the different of 33 days which equals 31.73%.

Item Type: Thesis (Bachelors Degree (S1))
Additional Information: 201310340311144
Uncontrolled Keywords: Conventional method, half slab method, time and cost
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 25 Jan 2019 03:27
Last Modified: 25 Jan 2019 03:27
URI : http://eprints.umm.ac.id/id/eprint/43624

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo