UMM Institutional Repository

PERENCANAAN PONDASI TIANG BOR PADA PEMBANGUNAN ARNAVA HOTEL & RESORT KOTA BATU

Ramadhan, Rizqi Adhitya (2018) PERENCANAAN PONDASI TIANG BOR PADA PEMBANGUNAN ARNAVA HOTEL & RESORT KOTA BATU. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (959kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (192kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (3MB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (638kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (4MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (124kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Every construction project requires a strong and safe structure planning. One of the essential structures is the foundation. The foundation planning must be accurate and in detail. Each of foundation must be able to support the load to its safe capacity, and further, to its maximum possible capacity. The purpose of this study is to make well plan of foundation from its type, depth and dimension, support capacity, to its structure based on the characteristics of the land and load structure. The land characteristics at the Arnava Hotel and Resort is the clayey silk with the depth of solid land is more than 5 meter. The calculation of the pile support capacity was done by using Mayerhof method. The structure reinforcement referred to SNI 2847:2013 on the Guideline of Concrete Structure Calculation for Building Construction. Based on the calculation, it was found that the dimension of pile foundation was of the diameter of 40 cm and the length of 4.8 m. The maximum support capacity was 1096.91 kN. The maximum immediate decrease was 0.599 cm. While the maximum consolidation decrease was 7.07 cm. The foundation used 8D19 reinforcement for the longitudinal and the D13-80 for the pile spiral reinforcement. The pile cap used for this construction was 1.8 m x 1.8 m x 0.5 m for type 1 and 1.7 m x 1.8 m x 0.5 m for type 2 and it also used the reinforcement of D16-100 mm.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201310340311014
Keywords: pile foundation, support capacity, foundation decrease, pile cap
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 25 Jan 2019 03:20
Last Modified: 25 Jan 2019 03:20
URI : http://eprints.umm.ac.id/id/eprint/43620

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo