UMM Institutional Repository

ANALISIS PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING METODE KONVENSIONAL DENGAN SISTEM PELAT BAJA (STUDI KASUS : PROYEK SMK MUHAMMADIYAH 1 KEPANJEN, KABUPATEN MALANG)

Susanto, Dharmawan Surya Adi (2018) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING METODE KONVENSIONAL DENGAN SISTEM PELAT BAJA (STUDI KASUS : PROYEK SMK MUHAMMADIYAH 1 KEPANJEN, KABUPATEN MALANG). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
pendahuluan.pdf

Download (651kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (580kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (937kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (924kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (494kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (2MB)

Abstract

The vast development of technology in construction is marked by new innovations in tools, materials, and methods. One of the new innovations in methods is the formwork of floor plate using the steel plate system to accelerate and to ease the construction of floor plate on a high-rise building. This study aimed to compare the construction cost and time between the Steel Plate system and the Conventional system. It was conducted on the construction of the building of Muhammadiyah Vocational High School 1 Kepanjen, Malang Regency. The data were collected through field observation, interview, and documentation. The analysis results showed that there were differences between the two systems. The formwork cost for the Conventional system was IDR 3.209.674.159,14,- with time estimation of 108 days. Meanwhile, the formwork cost for the Steel Plate system was IDR 4.017.614.375,00- with time estimation of 65 days. The differences existed due to the different use of materials and tools and the labours' skills. As a suggestion, it is important to consider the efficiency and effectiveness of the construction method.

Item Type: Thesis (Bachelors Degree (S1))
Additional Information: 201210340311086
Uncontrolled Keywords: formwork, conventional, steel plate, cost and time
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 24 Jan 2019 04:32
Last Modified: 24 Jan 2019 04:32
URI : http://eprints.umm.ac.id/id/eprint/43594

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo