ANALISIS PENGENDALIAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF UNTUK MEMAKSIMALKAN WAKTU DAN ANGGARAN BIAYA PADA PERENCANAAN PEMBANGUNAN NEO CONDOTEL BY ASTON KOTA BATU

Ramadhan, Harri Mulyo (2018) ANALISIS PENGENDALIAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF UNTUK MEMAKSIMALKAN WAKTU DAN ANGGARAN BIAYA PADA PERENCANAAN PEMBANGUNAN NEO CONDOTEL BY ASTON KOTA BATU. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (240kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (890kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (6MB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (161kB)
[img] Text
Lampiran.pdf
Restricted to Registered users only

Download (275kB)

Abstract

Project Activities can be interpreted as a temporary activity that takes place in certain times with a certain allocation of resources and is intended to carry out tasks whose targets are clearly outlined. However, in the implementation of the project there is occasional discrepancy between the planner and the current conditions in the field due to changes in the project situation, the influence of weather factors, design changes, materials or equipment, inadequate employment needs, planner error or specification. In this case, the authors will conduct project acceleration analysis with the addition of working hours for 4 hours using time cost trade off analysis method. This method aims to shorten the duration of project implementation and analyze the effect of the addition of working hours can shorten the duration with additional costs so as to know the maximum acceleration and the minimum cost. The calculation begins with determining the work on the critical path and then crashing to get the lowest cost slope. The results of this analysis found that the acceleration resulted in a reduction in the duration of implementation from 396 days to 359 days with an increase of acceleration cost from Rp30.199.222.313.54 to Rp30.342.097.464.01 with the difference in cost of Rp142.875.150,47. s

Item Type: Thesis (Bachelors Degree (S1))
Additional Information: 201110340311142
Uncontrolled Keywords: Project acceleration, Time cost trade off, Critical path, Cost slope, Additional working hour
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 04 Jan 2019 08:32
Last Modified: 04 Jan 2019 08:33
URI : http://eprints.umm.ac.id/id/eprint/42887

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo