UMM Institutional Repository

PENJADWALAN FLOWSHOP MIXED INTEGER PROGRAMMING UNTUK MEMINIMASI TOTAL EARLINESS DAN TARDINESS (Studi Kasus di PR Putra Maju Jaya Sidoarjo)

Chusnah, Umrotul (2018) PENJADWALAN FLOWSHOP MIXED INTEGER PROGRAMMING UNTUK MEMINIMASI TOTAL EARLINESS DAN TARDINESS (Studi Kasus di PR Putra Maju Jaya Sidoarjo). Undergraduate (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (245kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (174kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (306kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (165kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (322kB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (158kB)
[img] Text
BAB VI.pdf
Restricted to Registered users only

Download (74kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (157kB)

Abstract

Scheduling is one of the important activities in the production process. Production scheduling is an activity of allocating resources, machinery and labor to carry our the task taking into account the available capacity. PR Putra Maju Jaya is one of the manufacturing companies that implements production pure flowshop. Less precisely the application of scheduling methods pure flowshop will cause problems. One of the problmes faced is the tardiness because the due date given by the company not in accordance with the completion time needed to complete a product. However, if the production completion time is faster than the specified due date, then it will cause a buildup of finished products in the warehouse. In this study, scheduling was done using the mixed integer programming method to minimize total earliness and tardiness. The results of this stud indicate that the mixed integer proramming method is able to minimize the total earliness and tardiness of 716,17 days or 70,9%.

Item Type: Thesis (Undergraduate (S1))
Student ID: 201410140311009
Keywords: Scheduling Pure Flowshop, Earliness, Tardiness, Mixed Integer Programming.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Engineering > Department of Industrial Engineering (26201)
Depositing User: CKO Repository
Date Deposited: 31 Dec 2018 06:58
Last Modified: 31 Dec 2018 06:58
URI : http://eprints.umm.ac.id/id/eprint/42752

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo