UMM Institutional Repository

ANALISIS PERBANDINGAN EFISIENSI PENGGUNAAN METODE BEKISTING KONVENSIONAL DENGAN METODE BEKISTING SEMI-SISTEM PERKUATAN BESI HOLLOW PADA PROYEK HOTEL IBIS SURABAYA

Parani, Ananda Rahman Arief (2018) ANALISIS PERBANDINGAN EFISIENSI PENGGUNAAN METODE BEKISTING KONVENSIONAL DENGAN METODE BEKISTING SEMI-SISTEM PERKUATAN BESI HOLLOW PADA PROYEK HOTEL IBIS SURABAYA. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (803kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (154kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (785kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (175kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (9MB)

Abstract

In structure construction, the wooden material is crucial. However, due to global warming, there is a demand for an alternative material that can replace, or at least decrease, the use of wood without lowering the structure’s quality. Ideally, the method used for constructing a building should be effective and efficient. Using the right method will benefit both the developer and the contractor. This study aimed to analyse the difference between the semi-system formwork method and the conventional formwork method in constructing Ibis Hotel Surabaya. Different from the Conventional system, the semi-system used the combination of cassava wood and 50,50,1.6 hollow steel. The calculation showed that the conventional method was 36% cheaper yet 38-days longer than the other one. In conclusion, in term of cost, the conventional method was more efficient. However, considering the future investment for another project, the semi-system method could be reliable and time-saving.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201210340311060
Keywords: formwork, structure, semi-system method, conventional, time, cost
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 17 Dec 2018 04:17
Last Modified: 17 Dec 2018 04:20
URI : http://eprints.umm.ac.id/id/eprint/42117

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo