STUDI RENCANA ANGGARAN BIAYA DAN PENJADWALAN PEKERJAAN STRUKTUR DENGAN METODE PERT PADA PERENCANAAN PEMBANGUNAN LABORATORIUM SENTRAL UNIVERSITAS MUHAMMADIYAH MALANG

Rahmadi, Mufid (2018) STUDI RENCANA ANGGARAN BIAYA DAN PENJADWALAN PEKERJAAN STRUKTUR DENGAN METODE PERT PADA PERENCANAAN PEMBANGUNAN LABORATORIUM SENTRAL UNIVERSITAS MUHAMMADIYAH MALANG. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (607kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (52kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (162kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (99kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (970kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (40kB) | Request a copy
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (3MB) | Request a copy

Abstract

Construction has several important and strategic roles in supporting the growth and development of various areas in life. both in economics, culture, education and no exception to the construction plan of Central Laboratory Building of University Muhammadiyah of Malang which is required for the addition of classroom for teaching and learning activities for academics. In this case, the author wants to learn about the planning of the required budgetary, making scheduling using the PERT method, as well as on the use of resources for the implementation. As for result for this study of planning it is found that the value of budget cost with + 10% tax is 14,671,660,000 IDR and the scheduling period is for 42 weeks, with the longest delay is for 43.20 weeks and the probability of completion is 99.86%. On the use of human resources, it is known to peak at the 15th week of the 4th month with the use of human resources of 104 per day (Workers/Day) with the details of 70 workers, 7 foremen, 6 leaders of workers, 9 carpenters, and 12 smiths.

Item Type: Thesis (Bachelors Degree (S1))
Additional Information: 201110340311148
Uncontrolled Keywords: scheduling, PERT method, resource
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 14 Dec 2018 09:12
Last Modified: 14 Dec 2018 09:12
URI : http://eprints.umm.ac.id/id/eprint/42030

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo