UMM Institutional Repository

ANALISA PERBANDINGAN BIAYA DAN WAKTU BEKISTING MENGGUNAKAN METODE SISTEM PERI DENGAN METODE SEMI SISTEM PADA KONSTRUKSI BUNKER (STUDI KASUS : GEDUNG RADIOTHERAPY RUMAH SAKIT LAVALETTE MALANG, JAWA TIMUR)

Ard, Bella Astrina Classinta (2018) ANALISA PERBANDINGAN BIAYA DAN WAKTU BEKISTING MENGGUNAKAN METODE SISTEM PERI DENGAN METODE SEMI SISTEM PADA KONSTRUKSI BUNKER (STUDI KASUS : GEDUNG RADIOTHERAPY RUMAH SAKIT LAVALETTE MALANG, JAWA TIMUR). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (328kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (95kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (313kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (154kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (870kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (31kB) | Request a copy
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Current tecknology in the field of construction is always experiencing growth, so that the competition between the contractors is inveitable. The condition is very profitable for both parties namely investors and contractors as service users. On the other hand requires a high level of expertise and accuracy for contractors in choosing the type of materials, to estimate costs, and determine the method of implementation so that the cost offered more efficient, and shorter implementation time with quality that can be accountable so as to save costs.The purpose of this plan is to compare the use of different formwork method that is system method (PERI) with method of semi system hollow reinforcement system 50.50.2 in terms of both cost and time aspect. For both methods are conducted literature studies and data collection and calculation on strengthening bekisting, the formwork calculation of material needs, analysis of productivity and duration and cost calculation work. From calculation of the cost of wall and plate work on the building project Radiotherapy Lavalette Hospital Malang known the cost of fromwork system (PERI) is Rp 7.309.598.135,00 billion while the cost is used for formwork method of semi-system that is equal to Rp 7.894.830.439,00 billion with a difference of 44 days longer work for semi formworks.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201310340311080
Keywords: System formwork, PERI system
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 10 Dec 2018 01:20
Last Modified: 10 Dec 2018 01:20
URI : http://eprints.umm.ac.id/id/eprint/41688

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo