UMM Institutional Repository

EFEKTIVITAS TATA LETAK TOWER CRANE PADA PROYEK EMBANGUNAN HOLLAND PARK CONDOTEL BATU MALANG TERHADAP WAKTU DAN BIAYA (Studi Perencanaan)

Abusama, M. Rahman (2018) EFEKTIVITAS TATA LETAK TOWER CRANE PADA PROYEK EMBANGUNAN HOLLAND PARK CONDOTEL BATU MALANG TERHADAP WAKTU DAN BIAYA (Studi Perencanaan). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (588kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (399kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (509kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (708kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (190kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (580kB)

Abstract

Properly choosen construction will affects to the success of a project. This is related to the performance of the tools used that will crate profits both in terms of time and cost.Tower crane is a heavy equipment and it has an important role in large-scale construction projects. decreasing of the tower crane productivity is a problem that occurs in often to the construction projects. one of the causes to risk low produtivity is layout of the tower crane inappropriate in a field. therefore, the purpose of this study is to find out how much the layout effectiveness between tower crane A and B based on time and cost. This research is descriptive quantitative with data collection method that is field observation and interview (interview). The results of the data obtained from the data collection method will be processed and analyzed. Based on the results of the data, the result of Tower Crane B placement is more efficient than Tower Crane A placement with estimated time & cost calculation from TC B, that is 339.05 days and Rp. 136.296.905, while TC A is 387.30 days and Rp. 155.693.255.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201110340311049
Keywords: Cost; Effectiveness; layout; time; Tower crane
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 06 Dec 2018 07:00
Last Modified: 06 Dec 2018 07:00
URI : http://eprints.umm.ac.id/id/eprint/41562

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo