ANALISIS PERBANDINGAN METODE ERECTION GIRDER MENGGUNAKAN CRAWLER CRANE DAN LAUNCHER GIRDER PADA PEMBANGUNAN UNDER BRIDGE STA 03+550 JALAN TOL PANDAAN-MALANG

Wicaksono, Muhammad Fadly (2018) ANALISIS PERBANDINGAN METODE ERECTION GIRDER MENGGUNAKAN CRAWLER CRANE DAN LAUNCHER GIRDER PADA PEMBANGUNAN UNDER BRIDGE STA 03+550 JALAN TOL PANDAAN-MALANG. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
Pendahuluan.pdf

Download (589kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (129kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (290kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (55kB) | Request a copy
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (2MB) | Request a copy

Abstract

The aim of this research is to know the reason to choose erection girder method, to know effective method for erection girder implementation, to know affecting factor of erection girder implementation process, and to compare erection girder method implementation using crawler crane and launcher method. First, the primary and secondary data were collected, then crawler crane and girder launcher method plan were analyzed. Material, equipment requirements, time, cost and quality of each method were analyzed. Furthermore, the results of the analysis are used to determine the most appropriate method. Based on the analysis that has been done, conclude that the affecting factors of using erection girder method was field conditions, field location, weather conditions, human resources, equipment specifications and equipment mobilization. The fundamental difference between the crawler crane method and the girder launcher is how to lay the girder beam at the point of support. The process of crawler crane method has relatively faster than girder launcher method, because equipment mobilization was done in separate condition, while girder launcher method has some advantages in terms of cost, equipment precision, and operation mode. From the analytical calculation, it can be found that the effective method of erection girder method implementation at under bridge Sta 03 + 550 tollroad Panddan-Malang project section 1 was using crawler crane with total cost Rp 828.800.000,- in 25 days.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 2013 1034 0311 213
Keywords: crawler crane, erection girder, launcher girder
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Retno Widiyastuti Ika Wijaya
Date Deposited: 05 Dec 2018 03:38
Last Modified: 05 Dec 2018 03:38
URI : http://eprints.umm.ac.id/id/eprint/41468

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo