UMM Institutional Repository

PERENCANAAN PERKERASAN LENTUR (FLEXIBLE PAVEMENT) MENGGUNAKAN METODE ANALISIS KOMPONEN PADA RUAS JALAN SUGIO KABUPATEN LAMONGAN JAWA TIMUR

Wardana, Wisnu Septa Bambang (2018) PERENCANAAN PERKERASAN LENTUR (FLEXIBLE PAVEMENT) MENGGUNAKAN METODE ANALISIS KOMPONEN PADA RUAS JALAN SUGIO KABUPATEN LAMONGAN JAWA TIMUR. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (349kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (606kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (3MB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (252kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository staff only

Download (925kB)

Abstract

Lamongan Regency is a Regency in East Java consisting of 476 villages spread over 23 sub-districts which have the most villages in East Java, which of course the provision of transportation will be a very urgent factor in supporting the daily activities of the community. There are many methods in plotting the flexible pavement, such as the 1987 SKBI Bina Marga Component Analysis method. The objective in this final project is to get the result of thickness of the flexible pavement, and to know the cost budget plan (RAB) on Sugio road project of Lamongan regency. In this pavement planning starts with secondary data collection in the form of land data, average daily traffic, road technical data, and standardization of unit price which refers to the provisions of public works office Lamongan. Based on the calculation result of the method, the thickness of pavement on the surface layer using Laston MS744 with 10 cm thick, the top foundation layer using class A broken rock with thickness of 20 cm, and bottom layer using A class aggregate with 28 cm thick. For the calculation of the cost on the road Sugio STA 0+000 - 2+200 obtained budget cost of Rp. 6.152.700,231 (Six Billion One hundred Fifty Two Million Seven Hundred Thousand Two Hundred Thirty One Rupiah).

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201110340311082
Keywords: Budget Cost, Componen Analysis, Roads, Thickness of Pavement.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: Officer Repository
Date Deposited: 22 Oct 2018 04:54
Last Modified: 22 Oct 2018 04:54
URI : http://eprints.umm.ac.id/id/eprint/38177

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo