ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN METODE TOP DOWN DAN METODE BOTTOM UP PADA PEKERJAAN BASEMENT TOWER 1 APARTEMENT DHARMAHUSADA LAGOON SUARABAYA

Al-Matin, Fawwaz Hilmi (2018) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN METODE TOP DOWN DAN METODE BOTTOM UP PADA PEKERJAAN BASEMENT TOWER 1 APARTEMENT DHARMAHUSADA LAGOON SUARABAYA. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (573kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (978kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (666kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (454kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

This analysis is aimed to know the difference between basement work on tower 1 Grand Dharmahusada Lagoon Surabaya using top down method and bottom up method in terms of cost and time of implementation. The bottom up method is the method where the work starts from the bottom level basement that starts from the foundation work until top floor as planned. The top down method is where the work starts from the ground floor along with the gradual upper stage work up to the most basic basement. In the Grand Dharmahusada Lagoon Surabaya project initially used the bottom up method but over time the owner decided to use the top down method. To start the comparative analysis the first thing to do is to collect the drawing data of bottom up method planning and top down method from the owner. The analysis performed on bottom up method and top down method is the analysis of implementation method, worker unit analysis, cost analysis, time implementation analysis. From bottom up and top down method of analysis get result, 41 weeks and cost Rp 92.886.534.553,82 in bottom up method while analysis on top down implementation method takes 30 weeks and cost Rp 95.394.827.811,07

Item Type: Thesis (Bachelors Degree (S1))
Additional Information: 201410340311237
Uncontrolled Keywords: Bottom Up, Top Down, cost, time
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Officer Repository
Date Deposited: 22 Oct 2018 04:50
Last Modified: 22 Oct 2018 04:50
URI : http://eprints.umm.ac.id/id/eprint/38172

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo