STUDI ESTIMASI ANGGARAN BIAYA DAN PERBANDINGAN DURASI WAKTU ANTARA METODE PDM DAN CPM PADA PERENCANAAN PEMBANGUNAN TK AISYAH KABUPATEN PONOROGO

Dinata, Aditiya Arga (2018) STUDI ESTIMASI ANGGARAN BIAYA DAN PERBANDINGAN DURASI WAKTU ANTARA METODE PDM DAN CPM PADA PERENCANAAN PEMBANGUNAN TK AISYAH KABUPATEN PONOROGO. Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (243kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (566kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (160kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (144kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

Construction is an important things in life, both in the field of economics, culture, and education. One example is the construction of TK Aisyah Kabupaten Ponorogo by the regional goverment for the purpose of advancing the education in the region. Every construction activity required budgeting plan in which the preparation need to be prepared well in order to achieve the optimal result according to budget spending and time required. Basicaly, the calculation on this PDM have the similarity with CPM, however, the difference lies in the utilization of the relational dependency, in which PDM has four relational dependency. The first stage of this research is to calculate the budgeting plan on the construction design of TK Aisyah Kabupaten Ponorogo and then next is to schedule the plan using PDM and CPM methods and also to analyze the worker need which is required. Once the calculation on the building plan of TK Aisyah Kabupaten Ponorogo according to the building design has been achieved, the result showed that the budget required to begin the construction is Rp. 488 091.000,00 within 60 days of working according to scheduling using CPM and PDM. The highest resources required to buolt the said building is lies on the work of collum structure that requires 50 workers, 4 foreman, 4 chief builder, and 6 bricklayer.

Item Type: Thesis (Bachelors Degree (S1))
Additional Information: 201110340311005
Uncontrolled Keywords: Scheduling, Construction, PDM, CPM
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Officer Repository
Date Deposited: 22 Oct 2018 02:58
Last Modified: 22 Oct 2018 02:58
URI : http://eprints.umm.ac.id/id/eprint/38163

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo