PERENCANAAN KONSTRUKSI BOX GIRDER BAJA DAN PONDASI SUMURAN PADA JEMBATAN MRAHU KABUPATEN MAGETAN

ANWAR, SAFIUL (2008) PERENCANAAN KONSTRUKSI BOX GIRDER BAJA DAN PONDASI SUMURAN PADA JEMBATAN MRAHU KABUPATEN MAGETAN. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PERENCANAAN_KONSTRUKSI_BOX_GIRDER_BAJA_DAN_PONDASI_SUMURAN_PADA_JEMBATAN_MRAHU_KABUPATEN_MAGETAN.pdf

Download (52kB) | Preview

Abstract

Bridge Medium supporter walke at the same time one of the fundamental medium of transportation system. Marginally bridge divided to become two part of that is : 1. Up Structure Of Bridge 2. Under Structure Of Bridge Girder is one of the structure element of bridge, Girder which in form of box have the nature of beneficial for bridges unfolded ± 30 m or more., because steel girder have high quality with form of stronger trapezium or box more strong arrest torsi. Mrahu Bridge with length 45 m at planning of up structure to the used by girder box with quality of steel 240 Mpa, high of girder 130 cm, wide of buttom flange 150 cm. Displacement at girder box with value 0.000016 very small, only just experience of displacement. Bore pile of foundation is an foundation shouldering burden of him by hard ground. At its planning of under structure planned with quality of concrete 25 Mpa, dimension of abutment planned widely 4.25 m, long 11 m, high 5.5 m. for factor of safety that is 1.5, from result of calculation got by security to rolling equal to 2.26, to shift equal to 2.29. at abutment weared by bore pile of foundation with diameter 200 cm at deepness 12 m got by bone 32 D20 ( As=10054.4 mm2)

Item Type: Thesis (Other)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Anggit Aldila
Date Deposited: 26 Apr 2012 02:34
Last Modified: 26 Apr 2012 02:34
URI: http://eprints.umm.ac.id/id/eprint/3020

Actions (login required)

View Item View Item