STUDI PENJADWALAN DAN RENCANA ANGGARAN BIAYA (RAB) PADA PROYEK PEMBANGUNAN PUSAT PERDAGANGAN CIREBON RAYA (PPCR) CIREBON – JAWA BARAT

WIJAYA, NANA LUSIANA (2008) STUDI PENJADWALAN DAN RENCANA ANGGARAN BIAYA (RAB) PADA PROYEK PEMBANGUNAN PUSAT PERDAGANGAN CIREBON RAYA (PPCR) CIREBON – JAWA BARAT. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
AE.pdf

Download (92kB) | Preview

Abstract

In each constructions was needed a good planning, because there so many activity in there and we’ll get fluency and exact time in implementation. To make a great design of cost, time, and resource need accuracy. Generally, the project will get some benefit if we could make optimum scheduling. Optimum time is scheduling that was arranged as the shortest time that possible to complete the project with smallest cost. The influence factors are; finishing time, leveling of resource, and curve S. At the final result, the finishing time of the project is 462 days or 16 months (Feb 5th, 2006 – July 28th, 2007), and total cost is Rp.22.750.170.998, - (exclude PPN 10 %).

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Anggit Aldila
Date Deposited: 24 Apr 2012 03:08
Last Modified: 24 Apr 2012 03:08
URI: http://eprints.umm.ac.id/id/eprint/2822

Actions (login required)

View Item View Item