PERENCANAAN INTERVAL OPTIMAL PERAWATAN KOMPONEN KRITIS PADA POMPA ROTARY MESIN DOUBLE EDGER DENGAN ANALISA KEANDALAN (Studi kasus : CV. Mayatama Manunggal Sentosa)

HAKIM, FAUZUL (2010) PERENCANAAN INTERVAL OPTIMAL PERAWATAN KOMPONEN KRITIS PADA POMPA ROTARY MESIN DOUBLE EDGER DENGAN ANALISA KEANDALAN (Studi kasus : CV. Mayatama Manunggal Sentosa). Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PERENCANAAN_INTERVAL_OPTIMAL_PERAWATAN_KOMPONEN_KRITIS_PADA_POMPA_ROTARY__MESIN_DOUBLE__EDGER_DENGAN_ANALISA_KEANDALAN.pdf

Download (68kB) | Preview

Abstract

This Research is done at July 2009 till September 2009 to collecting damaged data and cost of the critical component of double edger machine. Intention of this research is to get an optimum time gap of replacement scheduled from double edger machine, to decreased cost of maintenance and repair the machine. By using reliability analiysis, a time gap replacement of critical component thats proposed can applied at the company to reduce the cost of component of replacement. With this models have determined that the optimum time gap replacement to component of seal that is 40 days with reliability level of component equal to 0,749 so that in 2008 – 2009 periods there are cost saving equal to Rp 5.276.491,44 with the old total cost Rp 19.157.346,32 and the new total cost Rp 13.880.854,43.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Industrial Engineering
Depositing User: Rayi Tegar Pamungkas
Date Deposited: 16 Apr 2012 04:49
Last Modified: 16 Apr 2012 04:49
URI: http://eprints.umm.ac.id/id/eprint/2273