UMM Institutional Repository

PENJADWALAN FLOWSHOP DINAMIS NON-DETERMINISTIK DENGAN METODE TABU SEARCH UNTUK MEMINIMASI TOTAL BIAYA KETERLAMBATAN DAN PENGERJAAN (Study Kasus : CV. Inti Daya Engineering – Buduran)

FAUZI, FIRMANDI (2013) PENJADWALAN FLOWSHOP DINAMIS NON-DETERMINISTIK DENGAN METODE TABU SEARCH UNTUK MEMINIMASI TOTAL BIAYA KETERLAMBATAN DAN PENGERJAAN (Study Kasus : CV. Inti Daya Engineering – Buduran). Other thesis, University of Muhammadiyah Malang.

Full text not available from this repository.

Abstract

CV. Inti Daya Engineering is a manufacturing company moving in the production of generator (alternative power) and Silent Canopy (the generator of iron plate) with the trademark Power Core. Completing orders on time is important thing for the make to order company. Because it will cause on cost efficiency that must be paid by the company. In the case of this study in fact arrival of job is varied (dynamic) and did not know when it will come (non-deterministic), then the scheduling must be adapted to the job arrival. The objective of this thesis is to be able to perform the scheduling of the company with scheduling dynamic non-deterministic flowshop. By using the tabu search method expected to help the company problems to make scheduling with Minimize Tardiness and Operation Cost. The stages of this research are following make scheduling the company with first come first serve rulers and proposed schedule with tabu search method. The stages of tabu search are generate first solution with earliest due date rulers, define goal, doing move and choose the best solution. From the results of research, performance criteria scheduling on the company is with total cost of Rp. 36.986.075,99 while the results of the proposed scheduling with tabu search method is with total cost of Rp. 32.785.021,14. Based on the results of the analysis that has been done, can be concluded that the proposed method is better to schedule the job in CV. Inti Daya Engineering because it can make savings in Tardiness and Operation Cost with savings of Rp. 4.201.054,85 of scheduling the company.

Item Type: Thesis (Other)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering > Department of Industrial Engineering (26201)
Depositing User: Halimatus Zahroh
Date Deposited: 06 Feb 2015 04:15
Last Modified: 06 Feb 2015 04:15
URI : http://eprints.umm.ac.id/id/eprint/15754

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo