Abstract

The implementation of project development of Rumah Susun Sederhana dan Sewa was having delay time in completion caused by discharging the main road entrance into project location by residents in around the area, delays installation or the making of structure like concrete beam, columns, plate and costs or finance problems. It can be seen based on time schedule of the project on the 22-28 October 2012 or upon project reached the 34 weeks, progress plan should reach 98,226 %, but reality on the field is realized 62,610 %, so it will be known that the project delays amount as -35,616 %. In this final project applied the Time Cost Trade Off method to accelerate the implementation of the project in order to achieve additional time some minimal level of. (Time Cost Trade Off) is the exchange of time and costs which means to accelerate its duration. The acceleration time is done by conducting Additional work hours. From the project schedule that is delay, projects completed in 47 Sunday time remaining ( 282 days ) with a total cost IDR 22,789,311,719,64. While project accelerated with Time Cost Trade Off method, project complete in time 40 Sunday with costs IDR 24,260,506,944,99. This means occurring additional costs IDR 1,471,195,224,80. Meanwhile, if the project finished in normal time (13 weeks), then projects will be worn a penalti ( a fine ), in which a fine each day is 0,1 % of the contract value with the amount of total fees IDR 1,950,000,000.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Halimatus Zahroh
Date Deposited: 28 Jan 2015 05:16
Last Modified: 28 Jan 2015 05:16
URI : http://eprints.umm.ac.id/id/eprint/15323

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo