UMM Institutional Repository

PENERAPAN ANALISA TIME COST TRADE OFF PADA JEMBATAN MANDIRO KABUPATEN BONDOWOSO–JAWA TIMUR

ADINATA, WAHYU (2014) PENERAPAN ANALISA TIME COST TRADE OFF PADA JEMBATAN MANDIRO KABUPATEN BONDOWOSO–JAWA TIMUR. Other thesis, University of Muhammadiyah Malang.

Full text not available from this repository.

Abstract

The bridge is located in the district Mandiro Bondowoso, sub Tegalampel Tanggulangin linking the village with the village between Mandiro. This bridge is very influential in the growth of rural economy Mandiro because this bridge is the only access to the village for Mandiro. In order for the implementation of the project goes well then needed a good project management as well. TCTO, time cost trade off or in the Indonesian language is also called the exchange of time and cost. The purpose of this scheduling method is to accelerate the project implementation time with the addition of overtime hours. Time difference between the normal time after time Time Cost Trade Off analysis obtained gap of 11 days which makes the cost of workers' wages and rental tools to swell by Rp 31,342,068 or 4.75% increase from the normal wage. The incremental cost calculation is derived from the total activities cost slope contained on the critical path network.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Halimatus Zahroh
Date Deposited: 28 Jan 2015 05:11
Last Modified: 28 Jan 2015 05:11
URI : http://eprints.umm.ac.id/id/eprint/15321

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo