UMM Institutional Repository

ANALISA BIAYA, WAKTU DAN SUMBER DAYA MANUSIA PADA PROYEK PEMBANGUNAN RSUD GAMBIRAN KOTA KEDIRI PROVINSI JAWA TIMUR

RA'UP, ABDUL (2011) ANALISA BIAYA, WAKTU DAN SUMBER DAYA MANUSIA PADA PROYEK PEMBANGUNAN RSUD GAMBIRAN KOTA KEDIRI PROVINSI JAWA TIMUR. Other thesis, University of Muhammadiyah Malang.

Full text not available from this repository.

Abstract

Construction Management or project management is an activity of planning, organizing, directing and controlling resources in the form of man, money, time, technology and materials to achieve the defined objectives and clearly defined, as efficient as possible. Cost is the total amount of expenditure required in a development project from the early stages of implementation until the project is completed. Length of time is the number of days required to complete a construction project. Human Resources is the number of workers required to complete a construction project. Projects under study in this thesis is a building site District General Hospital located on the road Kapten Tendean Kediri city of East Java Province. The building project has a build area of 7880 m2 with five floors From the calculation of costs based on analysis of material prices Kediri fiscal year 2009 the total cost amounted to Rp. 24.995.115.000,00 the human resources total cost to Rp 438,135,800 and the materials total cost Rp 24,556,979,200. The result of calculation showed that the duration of the project implementation plan can be completed 38 weeks. Results of the analysis show that how to organize and put human resources in order to avoid large-scale fluctuations is to flatten the use of labor (recource leveling), namely by shifting the work schedule which has a float in such a way that does not interfere with the overall project completion. From the calculations in getting that human resources are in use during the project is 11,174 persons.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Halimatus Zahroh
Date Deposited: 26 Jan 2015 05:39
Last Modified: 26 Jan 2015 05:39
URI : http://eprints.umm.ac.id/id/eprint/15185

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo