PERENCANAAN ANGGARAN BIAYA, WAKTU DAN SUMBER DAYA MANUSIA PADA PROYEK PEMBANGUNAN GEDUNG REKTORAT UNIVERSITAS MUHAMMADIYAH PONOROGO DENGAN MENGGUNAKAN MS – PROJECT 2003

MU’JIZAT, WACHID (2006) PERENCANAAN ANGGARAN BIAYA, WAKTU DAN SUMBER DAYA MANUSIA PADA PROYEK PEMBANGUNAN GEDUNG REKTORAT UNIVERSITAS MUHAMMADIYAH PONOROGO DENGAN MENGGUNAKAN MS – PROJECT 2003. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PERENCANAAN_ANGGARAN_BIAYA.pdf

Download (148kB) | Preview

Abstract

In building a building required a careful planning, because there are a variety of activities in it so that in later for its implementation can be smoothly and on time. To plan a budget, time and good human resources required accuracy, in general, the project will benefit if the schedule can be made optimally. And that is the optimal time schedule established as the shortest time possible to complete the task in a cost-terkecil.Dan factors affecting, among others; time of settlement, equitable distribution of resources and shape of the curve - S as desired. At the final stage it was concluded that the project completion time 345 days / 12 months (08 January 2007 - January 24, 2007) with a total cost of Rp. 3,972,340,000.00.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Rayi Tegar Pamungkas
Date Deposited: 24 Jul 2012 01:30
Last Modified: 24 Jul 2012 01:30
URI: http://eprints.umm.ac.id/id/eprint/12800