EVALUASI MANFAAT JALAN LINGKAR SELATAN KOTA PASURUAN DITINJAU DARI SEGI PENGGUNAAN BAHAN BAKAR KENDARAAN DAN NILAI WAKTU PERJALANAN

Hadi, Muhammad (2006) EVALUASI MANFAAT JALAN LINGKAR SELATAN KOTA PASURUAN DITINJAU DARI SEGI PENGGUNAAN BAHAN BAKAR KENDARAAN DAN NILAI WAKTU PERJALANAN. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
EVALUASI_MANFAAT_JALAN_LINGKAR_SELATAN_KOTAPASURUAN_DITINJAU_DARI_SEGI_PENGGUNAAN_BAHAN_BAKARKENDARAAN_DAN_NILAI_WAKTU_PERJALANAN.pdf

Download (89kB) | Preview

Abstract

Pasuruan southern ring road be made as long-term plans of local governments to reduce road traffic Koa, so that after the southern ring road is expected to be useful for road users, in this case of heavy vehicles, light vehicles, and motorcycles, because not every when the city streets to serve a growing population density over time with increase in the number of motor vehicles. With the construction of ring road south of Pasuruan, then the benefits arising from the southern ring road making it in terms of travel time associated with vehicle operating costs. The data obtained are the primary data of the speed surveys, traffic volume, and geometric roads, secondary data, ie map the location of the southern ring road, GDP, population Pasuruan, and component prices BOK. Analysis of street performance using the method of the Indonesian Highway Capacity Manual (IHCM), vehicle operating cost analysis method Jepan International Cooperation Agency, and travel time analysis using the method Appoaach Income. Based on the analysis and discussion, obtained by the performance of city street that is exactly on Jl. Ir. Juan (DS = 0.63), the performance of the southern ring road that is at the point of entry from the direction of the southern ring road towards the city of Malang, Probolinggo and Surabaya direction (DS = 0.24), the difference in vehicle operating cost Rp. 38,671.00 per day. And for the difference in travel time value of Rp. 1,015,694.00 per day. The total value of the excess cost operasikendaraan and vehicle time cost of Rp. 1,760,622.00 per day. So we can conclude in terms of vehicle operating costs and travel time costs are cheaper vehicles when vehicles pass through the ring road south of the town of Pasuruan.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Rayi Tegar Pamungkas
Date Deposited: 09 Jul 2012 02:35
Last Modified: 09 Jul 2012 02:35
URI: http://eprints.umm.ac.id/id/eprint/11496

Actions (login required)

View Item View Item