STUDI EVALUASI DAMPAK OPERASIONAL JALAN LINGKAR TERHADAP PENDAPATAN TERMINAL (Studi Kasus Terminal Kota Pandaan Kabupaten Pasuruan)

Yudha, Dian Prawira (2006) STUDI EVALUASI DAMPAK OPERASIONAL JALAN LINGKAR TERHADAP PENDAPATAN TERMINAL (Studi Kasus Terminal Kota Pandaan Kabupaten Pasuruan). Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
STUDI_EVALUASI_DAMPAK_OPERASIONALJALAN_LINGKAR_TERHADAP_PENDAPATAN_TERMINAL.pdf

Download (108kB) | Preview

Abstract

City Ring Road Project Development Pandaan cause effects that negatively impact the revenue aspect of retribution Pandaan bus terminals because most bus routes pass through select perform inconsistencies ring road to get ahead of each other so that buses do not enter the passenger terminal routes inconsistency Pandaan.dengan existence, question arises, how much Bus levy income decline diterminal Pandaan, how is performance street In the City Road Roundabout Pandaan Pandaan compared and what the route cause of occurrence of inconsistencies. Data - the data is primary data obtained are: Speed Survey Data, Volume traffic - and Geometric Road, secondary data, namely: City Population Pandaan, Levies Revenue Pandaan bus terminal, Bus Departure Schedule from Arjosari and Bungurasih. Evaluation visits from income levies bus terminal during operating hours per day Pandaan Terminal. While the road Performance Evaluation using the Indonesian Highway Capacity Manual Results of data analysis, with the inconsistency of the Terminal Pandaan route experienced a decline in income of approximately Rp. 73 000, - / day so that the estimated terminal Pandaan deficient bus levy income from the sector amounted to Rp.26.645.000, -/year. For performance road Pandaan At highway capacity value amounting to 2613.6 pcu / h so that the value of DS = 0.82, while on the City Ring Road Capacity Pandaan street value of 2910.6 pcu / h with a value of DS = 0.80. Seeing the results of evaluation of the main cause of this inconsistency studied bus routes allegedly because of differences in length of bus lane in the direction of Malang - Surabaya or otherwise passing through the city by crossing the Ring Road Pandaan Pandaan so that travel time when passing Roundabout Pandaan relatively faster in the appeal through the City Pandaan.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Zainul Afandi
Date Deposited: 02 Jul 2012 05:25
Last Modified: 02 Jul 2012 05:25
URI: http://eprints.umm.ac.id/id/eprint/10634

Actions (login required)

View Item View Item