ANALISA PERGERAKAN PENUMPANG DAN KENDARAAN PADA PELABUHAN PENYEBERANGAN UJUNG – KAMAL MADURA

ZISWANTO, ZISWANTO (2006) ANALISA PERGERAKAN PENUMPANG DAN KENDARAAN PADA PELABUHAN PENYEBERANGAN UJUNG – KAMAL MADURA. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
ANALISA_PERGERAKAN_PENUMPANG_DAN_KENDARAAN_PADAPELABUHAN_PENYEBERANGAN_UJUNG.pdf

Download (138kB) | Preview

Abstract

Kamal Madura ferry ports are the gateway out of the entry flow of traffic towards the island of Java, especially Surabaya. The movement of passengers and vehicles at the port of Kamal occur from year to year, causing increased flow of movement of passengers and vehicles that will cross the Strait of Madura become fluent and frequent queues. To predict the arrival of passengers and vehicles in 2020 used linear regression method, while for analyzing queue using queue theory by Edward K. Morlok "Introduction to Transportation Engineering." The calculation of the number of vessels based on the number of passengers or vehicles that are not transported. From the analysis that the movement of passengers and vehicles in 2005 amounted to 9,366,746 passengers got soul, 2 wheel vehicle registration for 1,489,155 units of vehicles, vehicle wheel 4 for 870,825 units of vehicles and passengers in 2020 forecast at 13,385,001 inhabitants, 2 wheel vehicle registration for 2,331,952 units of vehicles, vehicle amounted to 1,235,919 units of 4-wheel vehicles. While the effect of queue condition occurs is currently qtotal = 4581.08 pcu / day, Htotal wheelers 2 = 0706 minutes, Htotal vehicle group III = 1292 minutes, Htotal vehicle group IV = 1933 minutes, Htotal vehicle group V = 2121 min, K = 15:27 pcu / day / meter, vehicle gap in the dock I = 7583 seconds, the pier II = 7:25 seconds, pier III = 7333 seconds. Meanwhile, to optimize the facilities and services to the possibility of passenger growth have added to the ticket office and vessel needs. Passenger ticket booth is available in 3 channel into 4 channels, 2 wheel vehicle ticket booth are available 2 channels to 3 channels, 4-wheel vehicle ticket booth still 2 channels with 3 dock, with the number of ships and boats operate 19 units 2 units ship with 3 reserves pier.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Zainul Afandi
Date Deposited: 30 Jun 2012 05:44
Last Modified: 30 Jun 2012 05:44
URI: http://eprints.umm.ac.id/id/eprint/10517

Actions (login required)

View Item View Item